Job Opportunities at EACOP Tanzania

Two upstream development projects, Tilenga and Kingfisher, respectively, that are not a part of EACOP development and investment are being built concurrently with EACOP. A Central Processing Facility (CPF) will be built into each development in order to separate and process the gas, water, and oil that are produced by the wells. Kingfisher is going to have a CPF with a maximum daily capacity of 42,000 barrels and four well pads. Tilenga boasts a CPF of 204000 bbl/d with 31 wellpads.

Possession of any necessary licenses or certifications, such as a Heavy duty driver’s license and certificate for truck drivers and water bowser drivers, crane operator certification for crane operators, or electrician licenses for electricians from government
authorities like EWURA.

Ability to use technology and equipment associated with the job, such as GPS systemsfortruck drivers or specialized tools for electricians.

Job Opportunities at EACOP Tanzania

For more information about these vacancies opportunities announced and how to apply, please download attachment PDF documents below

DOWNLOAD HERE PDF FILE

Add a Comment

Your email address will not be published. Required fields are marked *